Project NFR
Rover 220 Coupe Turbo -N285FDH
Thursday 3 April 2014
Saturday 29 March 2014
final tidy up
New exhaust from downpipe to back box including cat.
Fans fitted and re-wired to work back with the auto switch's.
CV Joints replaced and front brakes fitted with braided hoses.
New control arms and track rod ends.
Wednesday 19 March 2014
getting there
After a little issues with the conversion from Air con to non air con with power steering pipes and alternator cables and even water pipes we are considerably closer than we were last week.
Tuesday 11 March 2014
The engine
Refurbished engine:
New Crank
New bearings
New piston ring
New gaskets
New water pump
New Thermostat
New Oil pump
New power steering pump
New core plugs
New distributor
refurbished sump
New Crank
New bearings
New piston ring
New gaskets
New water pump
New Thermostat
New Oil pump
New power steering pump
New core plugs
New distributor
refurbished sump
Sunday 18 November 2012
What have we got?
After the car arrived looking like an Ikea reject i was a little down hearted.
After spending 2hrs on Sunday morning to see what we got, all we need is the following:
After spending 2hrs on Sunday morning to see what we got, all we need is the following:
- Front Bumper needs replacing
- Spot Lights
- Inter-cooler
- fan bracket
- Centre Console
- Cream Leather Arm rest
- Front disc brakes & pads
- Front calipers
- Turbo
- Boost pipes
- cat back zorst
- Washer jets and pipework
- screws for HT lead cover
- mud flaps
So not major.....
Subscribe to:
Posts (Atom)